Author Archives for GMSL GMSL
January 31, 2022 5:17 pm
Published by GMSL GMSL
GTS published that the installation of a new connecting pipeline in Grijpskerk is needed: https://www.gasunietransportservices.nl/en/news/werkzaamheden-compressorstation-grijpskerk. This change will temporarily reduce the available GTS Exit transport capacity at UGS Bergermeer. You... Read more
January 28, 2022 2:25 pm
Published by GMSL GMSL
As communicated in our previous newsletters, several investigations were conducted on the failures of the compressor motors. These concluded that liquids in the compressor motors, in combination with other contributing... Read more
December 10, 2021 4:07 pm
Published by GMSL GMSL
As communicated in July, withdrawal availability will remain to be based on free flow withdrawal for as long as possible. TAQA has assured these free flow capacities are maximised. The... Read more